Cooling down in large swimming pool in Czech Republic

08/11/2015

During such hot days as today it is nice to cool down in one of the largest natural swimming pools in Czech Republic.

The swimming pool, located in Ostrava, is 380 m long and 220 m wide. It updated its entrance area and Tebodin did the detailed design. Besides the entrance, also the administrative buildings were reconstructed.

The concept was based on maximum utilization of the potential of the existing building and related spatial areas, with efforts to implement the least possible interference with minimum expenditure of funds.
 
An indispensable point of the proposal was the proposal of modernization and optimization of visitor facilities and administration premises according to applicable standards, current trends and actual needs of the operation.
 
Today, families and children enjoy the swimming pool with all facilities like giant slides and a toboggan, mini-golf, tennis, streetball, petang, and volleyball facilities.