Poznań City Center Sp. z o.o.

Infrastructure new Integrated Communication Centre 
Central railway station Poznan, Poland 

For this new communication centre, Bilfinger Tebodin executed design services. The scope of work consisted of the development of building permit documentation and detailed road designs, track design, the development of traffic organization and light system, electric traction, sanitary and tele technical design, and the coordination of all design works. 
The total roads length is 2.3 km while the length of the tram traction  is 1.0 km
 

Print