Petroleum Ltd (British Virgin Islands)

Technical audit of LPG Terminal in order to study the basic conditions, which may influence further development of site
Kerch, Ukraine

Bilfinger Tebodin completed a technical report for the client, studying

  • Existing on-shore facilities: available design information, structures/buildings, engineering networks, transport infrastructure, loading/storage facilities,
  • The process part: LPG loading/unloading designed and actual (compressors, pumps, loading arms/hoses), safety issues, bottlenecks identification, limitations, ways of improvement,
  • The Marine part: jetty condition, water basin and approach channel, limitations regarding ship sizes.
Print