Mondeléz

New biscuit production plant of 60.000 m2
Opava, Czech Republic

Mondeléz is a world-known multinational confectionery, food, and beverage company, headquatered in the USA. The new biscuit production plant was a huge EPCm project for Bilfinger Tebodin, completed successfully. The new facility has a floor area of 60.000 m2 and a built-up area of 34.500 m2.

Working on this project for Mondeléz, Bilfinger Tebodin provided both civil and process engineering, with bonus-malus scheme for construction costs, time schedule and health and safety coordination. Over 500 workmen worked on the site during a challenging construction period with high quality rules and regulations.

Our scope of work: project management, revision of conceptual design, basic design, permit documentations (planning and building), tender design, permitting support both building and trial operation), procurement for the general contractor, construction management incl. H&S coordination, cost control, assistance during commissioning

Print