GDF Suez (now ENGIE)

Windmill park with an output of 30 MW 
Watkowo, Poland

For the biggest windmill farm project in Central Europe back then, with an output of 30 MW, Bilfinger Tebodin performed the owner’s engineer services. The scope of work consisted of procurement for contractors, verification of the detailed design, procurement for the turbine delivery and installation, project management, multidisciplinary technical supervision, cost management and supervision of commissioning phase.

Based on an agreement with GDF Suez Zielona Energia Sp. z o.o., Bilfinger Tebodin was also responsible for the construction, commissioning and plugging into the grid 30 MW wind farm consisting of 15 turbines (each with a capacity of 2.05 MW).

51 MW capacity wind farm
Pagow, Poland

As the company supports zero-carbon transition as a necessary transformation creating value, ENGIE asked Bilfinger Tebodin to perform owner's engineering for a new 51 MW capacity wind farm. Construction management services inluded FIDIC contract engineering, safety and environmetal supervision, technical site supervision, cost control, procurement, value engineering and comissioning support.

We also worked on other windmill farm projects in Poland and Romania for NorventoPolska, GreenBear, Polish Energy Partners, and Eolfi.