Tebodin in Eastern Europe

Navigation
Health & Nutrition
Place for the big image

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

Health & Nutrition

Health & Nutrition show references
A.C.Toepfer International

A.C.Toepfer International

Project: Grain transport gallery
Location: Odesa Sea Port, Ukraine

During the erection of the grain transfort gallery on Odessa's sea port, Tebodin was responsible for the construction management.

SUN InBev

SUN InBev

Project: New brewery plant with capacity of 4 mln hectoliters/year
Location: Angarsk, Irkutsk region, Russia

The new developed and constructed brewery in Irkuts region in Russia has a production capacity of 4 million hectoliters a year. The scope of work, Tebodin executed, consisted of conceptual design, basic design, permitting, procurement, and construction management (EPCm services).

Nestlé

Nestlé

Project: New coffee plant Second phase of a coffee plant (Nescafe Gold line)
Location: Timashevsk, Krasnodar region, Russia

The second phase of the new coffee plant includes the Nescafe Gold line. Tebodin was responsible for the basic design, detail design, permitting, procurement, and construction management (EPCm services).

 

 

Ferrero

Ferrero

Project: Confectionery plant
Location: Vladimir region, Russia

Ferrero constructed a new confectionery plant in Vladimir region. As one of the involved parties, Tebodin did due diligence (cost estimation), basic design, and construction management.

Cargill

Cargill

Project: Chicken processing plant
Location:  Efremov, Russia 

EPCm services 

Bunge

Bunge

Project: Oil extraction plant 
Location: Nikolaev sea port, Ukraine 

For Bunge's new oil extraction plant in Nikolaev see port area, Tebodin executed an assessment of the design and construction works status. Also the conceptual design and  budget estimation 30% accuracy has been realized.

 

 

Desnagrain

Desnagrain

Project: Re-construction of the seed station
Location: Dimitrovka, Chernigiv region, Ukraine

The scope of work of the re-constuction project consisted of project management and construction supervision during the construction finalization stage.

Roshen

Roshen

Project: Confectionery production and distribution center
Location: Lipetsk, Russia

Tebodin was responsible for the basic design of the new production and distribution facility. In 2013 the first stage of the construction was put into operation that consisted of: finished product storage, networks, roads, facilities of engineering infrastructure (water inlet, boiler-house, etc.), diesel house and cold store.

Inmarko

Inmarko

Project: Construction of a new ice-cream production plant
Location: Tula region, Russia

Technical supervision.

MaltEurope

MaltEurope

Project: Reconstruction of a malting plant
Location: Belgorod region

Technical due diligence and environmental health & safety due diligence of the site (Phase 1 and Phase 2).

Campina

Campina

Project: Yogurt plant and several extensions
Location: Moscow region, Russia 

Complete engineering, permitting, procurement, construction management, commissioning.

Solntse Mexico (Gruma Corporation)

Solntse Mexico (Gruma Corporation)

Project: Development of a tortilla factory
Location: Moscow region, Russia 

Solntse Mexico is a part of Mission Foods company , subsidiary of Gruma Corporation, which operates in Russia. The company produces corn tortillas, corn chips, sauces and spices since 1996. The cooperation between Tebodin and Solntse Mexico started in February 2015. The total construction area of the new facility is about 12.000 m2. Tebodin in Russia signed an EPCm contract which include basic design, permitting, procurement, detail design supervision and construction management.

Danone

Danone

Project: Modernization of dairy plant
Location: Kremenchug, Ukraine

In 2011 the joint company 'Danone-Unimilk' resumed work on the reconstruction of dairy plant in Kremenchug within the first launching complex. The reconstruction referred to the existing old production building of the total area of 9,553 m2. The objective of the reconstruction was to meet corporate manufacturing standards and increase productivity.

Tebodin  scope: as-built documentation, engineering surveys, detail process concept drafting/working-out, detail design documentation, permitting assistance, general contractor tendering/supervision